The railway arrived on this riverbank in 1854. Melbourne Terminus began with weatherboard sheds and one platform, a much smaller operation than the building now associated with Flinders Street. The difference matters when looking at old views: the railway site and the present station building have different starting dates. The Victorian Government marked 12 September 2024 as the station’s 170th anniversary.
Iconic Flinders Street Station Celebrates 170 Years ↗
Rebuilding was a long process rather than a single opening-day transformation. Demolition of earlier structures began in 1900 and construction of the new station began in 1905; the work was completed in 1910. Its architects were Fawcett and Ashworth. A surviving fragment of the earlier station travelled elsewhere: a section of its roof was transferred to Hawthorn Station in 1901.
The Victorian Railways: A Thematic History (February 2024), section 3.6.1 ↗ · Flinders Street Station upgrade ↗ · Iconic Flinders Street Station Celebrates 170 Years ↗
The clocks made railway time visible in the street. The tower clock was made by Melbourne clockmaker F. Zeigler and installed in 1907. Departure clocks required their own routine of manual adjustment, work that sat behind the familiar public face of the station. Meeting under the clocks became an enduring local practice, linking a piece of transport equipment to everyday social life.
Flinders Street Station upgrade ↗ · Iconic Flinders Street Station Celebrates 170 Years ↗
Conservation has also changed what a visitor sees. During the upgrade completed in 2020, investigation of old paint layers helped recover the original 1910 colour scheme. The façade, awning, doors and windows were repaired, and the clock mechanism and tower received attention. Comparing the circa-1914 photograph with the 2025 view reveals the persistence of the corner entrance while reminding us that its appearance depends on continuing maintenance.
Flinders Street Station upgrade ↗ · Iconic Flinders Street Station Celebrates 170 Years ↗
A few moments in time
These entries reflect the available evidence. Gaps do not mean that nothing happened.
12 September 1854 — Melbourne Terminus opens
The station begins operations as Melbourne Terminus, with weatherboard sheds and a single platform.
Evidence: Iconic Flinders Street Station Celebrates 170 Years1905–1910 — The present station takes shape
The present station building is constructed; it is completed in 1910.
Evidence: The Victorian Railways: A Thematic History (February 2024), section 3.6.11907 — The tower clock is installed
F. Zeigler’s tower clock is installed.
Evidence: Flinders Street Station upgrade2020 — A major restoration is completed
The major station upgrade is completed, including heritage restoration.
Evidence: Iconic Flinders Street Station Celebrates 170 Years
See these moments on the Melbourne timeline ↗
Look through the collection

Sources & further reading
The account above is our synthesis. Follow the records below to distinguish original evidence from later interpretation. Research checked 26 September 2026. Human editorial review: 26 September 2026.
- Iconic Flinders Street Station Celebrates 170 Years ↗
Victorian Government · institutional or community history · Accessed 2026-09-26 - The Victorian Railways: A Thematic History (February 2024), section 3.6.1 ↗
Heritage Victoria · institutional or community history · Accessed 2026-09-26 - Flinders Street Station upgrade ↗
Public Transport Victoria · institutional or community history · Accessed 2026-09-26